Separator Review
Upload a datasheet, get a comment sheet with clause references.
An independent technical review of separator sizing and datasheets. Every comment has a severity, the calculation behind it, the clause it rests on and a recommended fix. Your senior reviewer signs off.
Runs in the browser · no install · free during beta
The problem
Every firm already pays senior hours to check separators.
A separator review means re-deriving K-values, retention times and level spacing from the datasheet and HMB, then writing it all up as a comment sheet. It is careful, repetitive work, and it lands on the people with the least time.
Separator Review does not compete with the designer's sizing tool. It checks the output, independently, and gives the reviewer every calculation to verify.
Sample output
A comment sheet your designer already knows how to answer.
V-1101 3-phase separator · Review comment sheet · Rev A
| No. | Section | Comment | Severity | Reference | Recommendation |
|---|---|---|---|---|---|
| 1 | Gas capacity | Souders-Brown K = 0.118 m/s at max gas case vs 0.098 m/s allowable for wire mesh, derated for 62 barg. | Hold | GPSA Ch. 7; vendor data | Increase ID or change to vane pack; confirm K with internals vendor. |
| 2 | Liquid retention | Oil retention 2.6 min vs 5.0 min required (24° API, foaming noted in basis). | Major | API 12J; configured criteria | Raise NLL or extend T/T length; re-check level spacing. |
| 3 | Inlet nozzle | Inlet ρv² = 7,200 Pa vs 6,000 Pa limit for vane-type inlet device. | Major | NORSOK P-001; configured criteria | Upsize inlet 12" → 14" or specify cyclonic inlet device. |
| 4 | Level settings | LAH to LAHH spacing 75 mm, below 100 mm minimum in configured criteria. | Minor | Configured criteria | Move LAHH up 25 mm; verify against slug volume. |
| 5 | Sour service | H₂S partial pressure 0.9 kPa(a) exceeds 0.3 kPa(a) threshold; no sour note on datasheet. | Minor | NACE MR0175 / ISO 15156 | Add sour-service material requirement to datasheet notes. |
| 6 | Geometry | L/D = 3.8, within 3 to 6 band. | Info | GPSA; good practice | None. |
Excel
Review comment sheet
The usual CRS layout: No., section, comment, severity (Hold, Major, Minor, Info), reference, recommendation, plus status and response columns for the designer.
Calculation note
Every check with inputs, equations, results and pass or fail, so the reviewer can verify each number.
Marked-up datasheet
Annotations on the original datasheet where the source was a PDF.
Checks and references (v1 rule pack)
Nine check areas. Every limit editable per client.
| Area | Check | Default basis (client override allowed) |
|---|---|---|
| Gas capacity | Souders-Brown K vs allowable for the installed mist eliminator (mesh, vane, cyclone), derated at high pressure | GPSA Ch. 7, API 12J, vendor data |
| Liquid retention | Oil and water residence time vs required, driven by API gravity, foaming and emulsion | API 12J, client spec |
| Level settings | LALL, LAL, NLL, LAH, LAHH spacing, hold-up and surge time, minimum level heights | Client spec, operator practice |
| Inlet nozzle | Inlet momentum (ρv²) vs inlet device limit | NORSOK P-001 or client spec |
| Outlet nozzles | Gas outlet momentum, liquid outlet velocity, vortex breaker | Client spec |
| Geometry | L/D ratio within typical band, droplet settling length | GPSA, good practice |
| Slug handling | Slug volume fits between NLL and LAHH | PIPESIM result or user input |
| Mechanical cross-check | Design P/T margin over operating, PSV set point consistency, fire case noted | API 521, client spec |
| Sour service | H₂S partial pressure flag for material requirements | NACE MR0175 / ISO 15156 |
ignzai checks against your configured criteria. It does not claim compliance with any company or industry standard.
- Engineer confirms every extracted value before checks run
- Accept, edit or reject each comment before export
- Every edit and rejection logged for audit
Demo
Datasheet to comment sheet in two minutes.
The 2-minute walkthrough is being recorded on a real 3-phase datasheet. Join early access and we will send it to you, or book a live walkthrough.
Get early accessFAQ
Does it claim compliance with my company's standards?
How are PDF datasheets read?
Can I edit or reject a comment?
What process data does it need?
Does it design the separator?
Which vessels are covered?
Send us a datasheet you have already reviewed.
See whether ignzai catches the same Hold and Major comments. Free during the 90-day beta.